Gypsum Powder Equipment for Building Industry Use

Introduction of Gypsum PowEPTEquipment for Building Market Use:

Controlling Portion Complete Automatic / Semi-Computerized
Once-a-year potential Customized (20, 000-300, 000 Tons Per Calendar year)
Calcining technique Ebullition furnace
Rotary kiln
Gasoline All-natural gasoline, diesel, coal, weighty oil
Raw content Organic Gypsum Rock (Articles of CaSO4@2H2O gt80%.)
Desulfurization Gypsum
Dephosphorization Gypsum
Concluded powEPTusage Gypsum board
Plaster powder
Location time The First Environment Time: Shall Not Be Less Than six Minutes,
The Closing Setting Time: Shall Not Be More Than thirty Minutes

one. Gypsum powEPTquality stXiHu (West Lake) Dis.Hu (West Lake) Dis.rd: in compliance with GB/T 9776-2008
two. Primary Technology(here get Nature gypsum rock as example)
Gypsum rock – first crushing -2nd crushing – grinding – calcining – getting older -completed products (CaSO4.1/2H2O)

Right after getting heated and calcined with certain temperature,natural dihydrate gypsum is dehydrated and decompounded,to get the product whose significant ingredient is semi-hydrated gypsum(CaSO4.1/2H2O),that is,calained gypsum(EPTly slaked gypsum).According to different temperatures and strain conditions during dehydration decomposition,the acquired solution is beta-Sort calcined gypsum.Fundamental method of mechanized prouduction incEPTs 5 massive methods:gypsum grinding,automatic measuring method,calcination program,warmth supply system,and aging ampEPT technique.In accordance to client’s requirement,gypsum crushing program can be added to crush huge gypsum rock to be with measurement of -30mm,and then conveyed into grinding program.

3.Payment situations:
A. Payment phrases: 30% T/T in progress 70%L/C or T/T
B. We can provide quality assure
C. Kunlun bank account offered to make convenient for Iranian client

About DCI:
HangZhou XiHu (West Lake) Dis.hu (West Lake) Dis. EPTry amp Gear Co., Ltd, established in 2008, is a extensive EPTrprise of EPTry manufacture, investigation ampdeveXiHu (West Lake) Dis.Hu (West Lake) Dis.ment and expense casting. It has 218 staffs and 53 technical staffs incXiHu (West Lake) Dis.Hu (West Lake) Dis. senior engineers, engineers and experts. It handles 30, 000 sqm land, and has machining workshop, electrical workshop and precision casting workshop with total sets of manufacturing and tests equipment. In 2008, it handed ISO9001: 2008 Top quality Management System Certification. In early 2013, following on-web site inspection and authentication by SGS, it turned audited provider of Created-in-China, and in Might, 2013, it handed ISO/TS16949: 2009 quotcasting and machining for automotive areas quot High quality Management Program Certification.

Our company EPTly types and manufactures total sets of developing supplies equipments, this kind of as paper area gypsum board manufacturing line, gypsum powEPTproduction line (natural gypsum and chemical gypsum), fiber cement board production line, calcium silicate board manufacturing line, cement production line, AAC block production line, stone manufacturing line, etc. Definitely we also source solitary EPTs, spare elements and donning components for these manufacturing traces At the exact same time, we create some uncooked materials for the generation lines, this kind of as modified starch, foaming agent, glue, and so forth.

Our company has effectively-seasoned skilled engineers and technological teams to ensure our customers with high-quality equipments. The effectively-skilled installation and commissioning crew and high-top quality process technologists give our consumers both at home and overseas with complete established of technological providers to make our consumers quotbuy with reassurance and use with gratification quot. In current years, our firm has completed creating supplies gear tasks in the Middle East, Central Asia and Eastern Europe, and so on, and has got extremely praises for both solution quality and right after-sale providers.

At the identical time, our business is also expert in precision casting, and the business handed TS16949 High quality certification. We can make fantastic selection of goods employed in EPT incXiHu (West Lake) Dis.Hu (West Lake) Dis. automotive amptruck, agricultural EPTry, mining EPTry, engineering EPTry, petroleum EPTry, electronic industry, and many others. The castings can be made subsequent stXiHu (West Lake) Dis.Hu (West Lake) Dis.rds this kind of as GB, ASME, DIN, NF, JIS, BS, AS, and many others.

Our senior engineer has labored in casting sector for more than forty years, and with his rich experience in castings, he can layout the fittest production program for all the castings, eEPTly for castings with high stage of trouble. Our entire sets of examination devices and EPTs and TQM administration method can make sure of reputable merchandise high quality. The precision of castings can achieve Quality CT3-CT4, and area roughness can attain Ra 3.two mu M. At the same time, we can supply even more-processing companies these kinds of as machining, poXiHu (West Lake) Dis.Hu (West Lake) Dis.ng, electroplating, and so forth. So considerably, we have equipped the merchandise to BeiEPTFoton, Sany Weighty Business, ANZ, GEGA(Germany) and numerous other domestic and international businesses.

Given that estabEPTd, we have been having quotXiHu (West Lake) Dis.Hu (West Lake) Dis.n oriEPTd, administration strengthened, survival with good quality, deveXiHu (West Lake) Dis.Hu (West Lake) Dis. with engineering quot as business spirit, to offer clients with fittest merchandise and earn broadly their praise. We, DCI, shall alwaEPTinsist on top quality basic principle of quotquality first, customer initial, crew function, continual enhancement quot, and adhere to organization philosophy of quothonesty oriEPTd, excellence go after quot, to recognize the goal of quotunited as a single to make us productive and consumer satisfied quot and to offer greater items and solutions for all previous and new buyers. quotLet our brand remain in the customers’ minds forever quot is our quality motivation, and we would like to perform collectively with all buddies for frequent deveXiHu (West Lake) Dis.Hu (West Lake) Dis.ment.

Warmly welcome all pals all more than the planet to our company!

Countrywide StXiHu (West Lake) Dis.Hu (West Lake) Dis.rd of Calcined Gypsum
StXiHu (West Lake) Dis.Hu (West Lake) Dis.rd No.: GB/T 9776-2008
Scope of application:
Gelled content produced by dehydrating natural gypsum(uncooked content). Its primary part is beta-GaSO4 middot1/2H2O, without having any admixture or additive.
The natural gypsum ought to be in conformity with demands of quotgypsum rock(JC/T700) for making cementing material quot gypsum rock of Quality three or much more greater grades.

Classification:
It is categorised to be three grades: three.,two.,and 1.six in accordance to its 2h strength(breaking energy).

Composition:
beta-GaSO4 middot1/2H2O content(mass fraction) in Calcined gypsum must be not less than 60.%.

Actual physical and chemical functionality:

Grade Fineness(Monitor residue of .2mm sq. screen)/% Placing time 2h energy/MPa
1st setting Ultimate setting Breaking energy Compression strength
3. le10 ge3 le30 ge3. ge6.
two. ge2. ge4.
1.six ge1.6 ge3.

Be aware: 1Mpa=ten.2kgf/cm2

Obligation of Buyer and Vendor
Geared up by Customer
one.one EPTry and resources for installation, fee and servicing
one.2 Transportation resource:two sets of forklifts
1.3 EPT offer method
a. High-voltage EPT supply
b. Substation and distribution station
one.four. Drinking water source amp storage and drainage program
one.five Civil engineering: Constructing development, products basis(incXiHu (West Lake) Dis.Hu (West Lake) Dis. pre-burying work), metal-concrete construction silos and pools.
one.6 Content employed for generating EPT’s platform and supporting body of equipment
Offered by Customer
2.1 Providing round-vacation ticket and other transportation expense for the Seller’s employees
two.2 Providing lodging and all sorts of necessary added fees for the Seller’s personnel in the course of set up and commissioning and instruction time period
two.three Providing all essential massive equipment for set up, this kind of as crane, forklift, welder, acetylene amp oxygen cutting EPT, etc
2.4 Offering assistant staff to cooperate with the Seller’s staff for the duration of setting up according to the Seller’s prerequisite
2.5 Use authorization for EPT gear
Supplied by Seller
two.1 Creation gear
two.2 Gypsum Board Generation Line,
Offering set up XiHu (West Lake) Dis.Hu (West Lake) Dis. engineers and complex staff
2.3 Providing 1 group leaders and 1 interpreters
2.4 Offering tools foundation drawings, EPT arrangement drawing of production line (layout program, elevation drawing and facet check out drawing) inside forty daEPTafter receiving down payment
2.5 Offering equipments’ procedure handbook throughout education
2.6 Supplying major equipments’ EPT assembly drawing, wiring diagram of manage cupboards, PLC personal computer programs inside 7 daEPTafter acceptance
2.7 The Seller is in charge of commissioning and education
a. Commissioning: the Vendor shall ship engineers and specialized personnel to EPT site to do total-scale tests, and the Customer shall also send out assistant workers to cooperate with the Seller’s folks.
b. The Seller’s personnel in charge of commissioning will do performance operation, make on-internet site speeches and answer concerns to Buyer’s technicians and procedure employees unEPTtraining. During the EPT method of testing, both sides shall operate with each other. Right after Buyer’s staff master operation technique, the Seller will hand in excess of the EPT managing line to the Buyer’s for operation and then the instruction work is finished.
two.eight In one particular 12 months soon after signing the Acceptance Certification, the Vendor shall give complex consultation to the Purchaser for free of charge. If the Seller’s people are asked to be on the website, the Buyer shall supply spherical-way tickets and accommodation overseas.

Environmental defense:
Principal pollution sources:
Squander residue: Squander board and board edge reduce down, and so forth.
Squander drinking water: The sediment h2o still left after the admirer circulation use in the item process, from washing pool and toilet drinking water.
Sound: mostly is 95Db(A)or so noise from the admirer.
Dust: From miXiHu (West Lake) Dis.ng substance and reducing board.
Disposal strategies:
Squander residue and disposal: It does not pollute the atmosphere and can be re-used afterreprocessing in gypsum powEPTproduction line.
Waste drinking water and disposal: No EPT squander water. The residing wastewater is drained into the EPT sewage community, and the creation wastewater from cleansing ground in the workshops can be recycled after the secondary sedimentation. And the drinking water used in these kinds of tools as supporter can also be recycled.
Sounds and deposition: Sounds, which largely will come from admirer. In addition to setting comfortable joints at the exhaust inlet and exhaust outlet. Established impedance sophisticated mufflers at the exhaust outlet, which can low the sound as much as 30Db (A).
Dust and disposal: Dust selection products will be equipped in the creation procedure.

Labor sanitation
Protection design and style
Basic safety design for factory area
The factory highway traffic style and out of doors fire hydrant arrangement will be in conformity with each requirement in quotAchitectural Style Hearth Avoidance Norm quot The pavements and drivewaEPTare clean, unblocked, and there are ample lights faXiHu (West Lake) Dis.Hu (West Lake) Dis.ties at evening Established covers in excess of the draniage ditches in the manufacturing facility Make it straightforward to go by means of, discharge, practical and risk-free at the identical time do virescence in the EPT factory to reduce the dust and noises.
Security layout for workshop
In the workshop, particular protected distance need to be left for the primary passages and functioning passages, between equipments and the creating, amongst gear and products, and among products and passages Established guard rail on all workbench edges Established handles over drainage ditches Lighting is sufficient in the workshop All electrical equipments have ground safety, and there is overhauling EPT of 36V to ensure of overhaul safety.
Harmful issue in producing:
Assortment of harmful compound: Noises from enthusiast, air compressor, and so forth.
Actions to lessen harmful aspects: Do best to choose reduced sounds equipments to reduce the noise from sound supply, and meanwhile incorporate anti-vibration soft connectioner and muffler on the fan.
Precautionary steps of safety and sanitation
Protective appliances shall be allotted to each worker according to real functioning problems All products is managed by specified individual, the comprehensive operational method shall be produced. Employees on duty have to carry on security education and corresponding expertise instruction strictly function according to procedure method to guarantee the person’s security and equipment’s excellent condition Often carry on basic safety education to staff Frequently organize safety inspecton to dispel the accident prospective in time.
Explosionproof
Explosive materials are not produced and discharged in the generation workshop of this undertaking. There is no factor of explosion.
Fire battling technique
Our tools is not straightforward to create fireworks, so never want any corresponding fire detection device.

Gypsum Powder Equipment for Building Industry Use